Project Overview

Compass Electrical Solutions recently partnered with Caravus to deliver a full-scale low voltage and audio/visual installation in their new office space. This project focused on building a connected, modern workplace with seamless technology integration to support communication, collaboration, and day-to-day operations.


Project Scope & Highlights

  • Data Cabling & Termination – Ran and terminated CAT-6 data lines to all cubicles for fast, reliable network access.

  • Audio System Installation – Installed speakers throughout the entire office with a single, centralized audio control solution.

  • Conference Room Tech – Outfitted multiple meeting spaces with video conferencing-capable TVs and microphones.

  • Smart TVs – Installed smart displays in the lobby and private offices for branding, communication, and convenience.

Smart Office, Smarter Solutions

From data and connectivity to AV and audio control, Compass Electrical Solutions delivered a cohesive, future-ready tech infrastructure tailored to how Caravus works and communicates.


Planning a new office or tech upgrade? Let’s connect.

RECENT POSTS

March 18, 2026
Project Overview Compass Electrical Solutions partnered with the White Bluff Apartments to address an urgent electrical issue triggered by insurance requirements. The complex’s aging electrical panels were deemed a fire hazard , prompting a full-scale replacement of panels and meter banks across the 39-unit property. Despite the scope and urgency, Compass delivered the entire project in under one week, with careful coordination to minimize disruption to tenants and maintain safety throughout. Project Scope & Highlights Furnished and installed a natural gas-powered Blue Star generator to supply full-building backup power Demolished 40 Unsafe 100-Amp Panels – Disconnected and safely removed all existing panels. Removed 39 Existing Meter Sockets – Properly decommissioned aging equipment. Installed New Meter Banks One (1) 26-gang meter bank with 600-amp main service disconnect One (1) 13-gang meter bank with 400-amp main service disconnect (with a 25-week lead time) Installed New Circuit Breakers – Matched to existing tenant circuit requirements. Reconnected Existing Circuits – Ensured continuity of service. Coordinated Power Cutover – Worked closely with the landlord and tenants to plan power shutoffs and minimize downtime.
March 13, 2026
Commercial electrical maintenance helps businesses save money by preventing failures, reducing downtime, and extending the life of electrical systems.
March 6, 2026
Project Overview Compass Electrical Solutions proudly partnered with the City of Hazelwood to install a 150 kW Blue Star natural gas emergency generator at the Hazelwood Fire Department . This critical upgrade ensures the entire fire station remains operational during power outages, supporting emergency response efforts when they matter most. Project Scope & Highlights 150 kW Emergency Generator – Furnished and installed a natural gas-powered Blue Star generator to supply full-building backup power. 600-Amp Automatic Transfer Switch – Supplied and installed a new ATS, mounted in the same location as the existing switch for seamless integration. Minimal Disruption, Maximum Preparedness – All work was completed with minimal impact to firehouse operations, ensuring continuity of service throughout.
Show More