City Of Hazelwood: Fire House Emergency Generator Installation

March 6, 2026

Project Overview

Compass Electrical Solutions proudly partnered with the City of Hazelwood to install a 150 kW Blue Star natural gas emergency generator at the Hazelwood Fire Department. This critical upgrade ensures the entire fire station remains operational during power outages, supporting emergency response efforts when they matter most.

Project Scope & Highlights



  • 150 kW Emergency Generator   Furnished and installed a natural gas-powered Blue Star generator to supply full-building backup power.

  • 600-Amp Automatic Transfer Switch – Supplied and installed a new ATS, mounted in the same location as the existing switch for seamless integration.

  • Minimal Disruption, Maximum Preparedness   All work was completed with minimal impact to firehouse operations, ensuring continuity of service throughout.

Critical Power For Emergency Response


With this generator system in place, the Hazelwood Fire Department is now equipped with reliable backup power that ensures lights, communications, and life-saving equipment remain online—regardless of grid conditions.


Supporting essential services with dependable solutions. Let’s power your mission.

RECENT POSTS

August 24, 2026
Project Overview Compass Electrical Solutions was proud to partner with Circadia on the renovation of Pathfinder Church' s new community room in St. Louis, Missouri. This transformation converted an existing space into a warm, modern gathering place with updated electrical infrastructure, energy-efficient lighting, and decorative fixtures designed to enhance the experience for church members and guests alike. Project Scope & Highlights Complete Electrical Demolition – Removed all existing electrical wiring and lighting from the original space. New Electrical Infrastructure – Installed new electrical systems to support the renovated community room. Custom Lighting Design – Installed energy-efficient lighting, dimming controls, and decorative fixtures to create a flexible, inviting atmosphere. Fire Alarm Relocation – Relocated existing fire alarm devices to accommodate the new layout while maintaining code compliance. Designed For Community Community spaces need to be both functional and welcoming. Compass Electrical Solutions worked closely with the project team to deliver an electrical system that supports everything from everyday gatherings to special events, while creating an environment that's comfortable, flexible, and built to last.
August 12, 2026
Project Overview Compass Electrical Solutions proudly partnered with CK Power on the installation of a 600kW Blue Star Emergency Generator, delivering reliable backup power while modernizing the facility's electrical infrastructure. In addition to the generator installation, our team consolidated the building's electrical service, creating a more efficient and streamlined power distribution system. Project Scope & Highlights 600kW Blue Star Diesel Generator Installation – Installed a commercial-grade emergency generator to provide dependable backup power for the facility. New 1,000-Amp, 277/480V Three-Phase Service – Upgraded the building's electrical service to support increased capacity and improved efficiency. Extensive Conduit Installation – Installed hundreds of feet of 3-inch and 4-inch conduit, including complex custom bends to navigate the existing facility. New 240V/200A Panel – Added dedicated power distribution for facility operations. 300 kVA Transformer Installation – Installed a new transformer to support the upgraded electrical system. 800-Amp Disconnect Switch – Added new disconnect equipment to improve safety and serviceability. Weekend Power Cutover – Carefully coordinated a facility shutdown over the weekend to transfer power and commission the new generator with minimal operational disruption. Reliable Power. Smarter Infrastructure. This project demonstrates Compass Electrical Solutions' ability to manage complex electrical upgrades while keeping business operations at the forefront. By combining emergency backup power with a more efficient electrical distribution system, CK Power now benefits from increased reliability, improved energy performance, and long-term operational flexibility.
July 21, 2026
Project Overview Compass Electrical Solutions recently completed a specialized electrical installation for Seiler Plastics , supporting the addition of new extruder and grinder equipment within an active manufacturing facility. This project required careful coordination to minimize disruption while expanding the plant’s production capabilities. Project Scope & Highlights Medium & Low Voltage Installation – Delivered comprehensive electrical infrastructure to support new manufacturing equipment. Power Distribution for Extruder Systems – Installed dedicated power solutions for the new extruder and associated equipment. Bus Duct Modifications – Updated existing bus duct systems to accommodate expanded operational demands. New Disconnect Installations – Added disconnects for improved safety, serviceability, and code compliance. Process Cooling Support – Provided electrical integration for process cooling systems critical to manufacturing performance. Supporting Industrial Growth with Precision Working within an active production environment, Compass Electrical Solutions ensured the project was completed safely, efficiently, and with minimal interruption to ongoing operations. The result is a scalable electrical system built to support Seiler Plastics’ continued growth and production demands.