City of Hazelwood: Emergency Commercial Generator Installation at Community Center

January 7, 2026

Project Overview

Compass Electrical Solutions was honored to partner with the City of Hazelwood on a critical infrastructure upgrade at their Community Center. This project involved the installation of a 500 kW Blue Star commercial diesel generator, designed to provide full-building backup power and ensure uninterrupted operation during outages.


Project Scope & Highlights

  • Installed 500 kW Emergency Generator – Furnished and installed a 24-hour diesel-fueled Blue Star commercial generator capable of backing up the entire facility.

  • Electrical Service Upgrade – Removed outdated 800-amp 3-phase 480V service and consolidated systems into a new 1200-amp 3-phase 480V service for increased capacity and reliability.

  • Circuit Relocation – Transferred branch and equipment circuits from the 800-amp service to the new 1200-amp service to ensure all critical loads are backed up by the commercial generator.

  • Switchgear Rework – Removed and relocated disconnect switches for seamless integration into the new system.

Powering Public Safety and Community Resilience

With this upgrade, the Hazelwood Community Center is now prepared to continue operations during power outages—supporting city functions, public gatherings, and emergency response efforts without interruption.


Building redundancy into your facilities? Let’s talk.

RECENT POSTS

March 13, 2026
Commercial electrical maintenance helps businesses save money by preventing failures, reducing downtime, and extending the life of electrical systems.
March 6, 2026
Project Overview Compass Electrical Solutions proudly partnered with the City of Hazelwood to install a 150 kW Blue Star natural gas emergency generator at the Hazelwood Fire Department . This critical upgrade ensures the entire fire station remains operational during power outages, supporting emergency response efforts when they matter most. Project Scope & Highlights 150 kW Emergency Generator – Furnished and installed a natural gas-powered Blue Star generator to supply full-building backup power. 600-Amp Automatic Transfer Switch – Supplied and installed a new ATS, mounted in the same location as the existing switch for seamless integration. Minimal Disruption, Maximum Preparedness – All work was completed with minimal impact to firehouse operations, ensuring continuity of service throughout.
February 20, 2026
Project Overview Compass Electrical Solutions is proud to play a foundational role in the transformation of downtown St. Charles with the demolition and electrical preparation of the former City Hall building , clearing the way for the future City Centre Complex (C3) development. Partnering with Kolb Grading, LLC , our team handled all aspects of the electrical demolition , making existing systems safe and removing critical infrastructure, including medium voltage feeders , to prepare the site for construction. Project Scope & Highlights Full Electrical Demolition – Safely removed and made-safe all existing electrical systems within the former City Hall. Medium Voltage Demolition – Disconnected and removed aging medium voltage feeders , panels, and outdated switchgear. New Infrastructure Installation – Furnished and installed new medium voltage feeders , panels , and switchgear to support ongoing site operations. Crossover Execution – Completed electrical crossover to maintain continuity during demolition and transition phases.
Show More