Missouri Baptist University: Campus Renovations with Modern Electrical Upgrades

November 26, 2025

Project Overview

Compass Electrical Solutions proudly partnered with Missouri Baptist University on three key renovation projects across campus, delivering modern, reliable electrical systems to support evolving student and administrative needs.


Project Scope & Highlights

  • Three Facilities Renovated – Administration Building, Dean of Students Center, and new campus Bookstore.

  • Power System Upgrades – Installed new wiring and distribution to meet current and future load demands.

  • LED Lighting Enhancements – Replaced outdated lighting with energy-efficient LED fixtures for improved performance and lower operating costs.

  • Low Voltage & Fire Alarm Systems – Installed cabling and components to support life safety systems, communications, and AV integration.

Supporting a Smarter Campus

From student-facing spaces to critical administrative offices, these renovations reflect Missouri Baptist University’s commitment to a more efficient, connected, and student-centered campus. Compass Electrical Solutions was honored to play a role in supporting that vision with scalable, code-compliant electrical solutions.


Planning your next campus upgrade? Let's connect.

RECENT POSTS

March 13, 2026
Commercial electrical maintenance helps businesses save money by preventing failures, reducing downtime, and extending the life of electrical systems.
March 6, 2026
Project Overview Compass Electrical Solutions proudly partnered with the City of Hazelwood to install a 150 kW Blue Star natural gas emergency generator at the Hazelwood Fire Department . This critical upgrade ensures the entire fire station remains operational during power outages, supporting emergency response efforts when they matter most. Project Scope & Highlights 150 kW Emergency Generator – Furnished and installed a natural gas-powered Blue Star generator to supply full-building backup power. 600-Amp Automatic Transfer Switch – Supplied and installed a new ATS, mounted in the same location as the existing switch for seamless integration. Minimal Disruption, Maximum Preparedness – All work was completed with minimal impact to firehouse operations, ensuring continuity of service throughout.
February 20, 2026
Project Overview Compass Electrical Solutions is proud to play a foundational role in the transformation of downtown St. Charles with the demolition and electrical preparation of the former City Hall building , clearing the way for the future City Centre Complex (C3) development. Partnering with Kolb Grading, LLC , our team handled all aspects of the electrical demolition , making existing systems safe and removing critical infrastructure, including medium voltage feeders , to prepare the site for construction. Project Scope & Highlights Full Electrical Demolition – Safely removed and made-safe all existing electrical systems within the former City Hall. Medium Voltage Demolition – Disconnected and removed aging medium voltage feeders , panels, and outdated switchgear. New Infrastructure Installation – Furnished and installed new medium voltage feeders , panels , and switchgear to support ongoing site operations. Crossover Execution – Completed electrical crossover to maintain continuity during demolition and transition phases.
Show More