MICDS Squash Courts: AV Integration & Power Installation

October 15, 2025

Project Overview

Compass Electrical Solutions partnered with Mary Institute and Saint Louis Country Day School (MICDS) to support a technology and power upgrade at their squash courts facility. The project involved TV installation, power and data infrastructure, and AV integration to support real-time scoring and enhanced user experience.


Project Scope & Highlights

  • Power Installation – Cut power into the wall above the squash courts to support mounted displays.
  • TV Installation – Mounted and installed six new TVs, each fitted with protective covers to withstand the court environment.
  • AV Cabling & Terminations – Installed HDMI and data cabling, enabling communication between the TVs and iPads used for scoring.
  • Labeling & Testing – Clearly labeled each display (including those in the courts and lobby) and tested all connections to ensure functionality.

Tech-Enhanced Athletics

With these upgrades, MICDS now offers a seamless, integrated scoring system that enhances both player and spectator experiences. The installation supports durability, ease of use, and real-time data display, all within a highly active athletic environment.

Smart AV + Power Solutions for Schools & Sports Facilities

Compass Electrical Solutions brings together precision installation and smart tech integration for schools, gyms, and recreational spaces. From cabling to final testing, we ensure every connection counts.


Planning an AV or tech upgrade? We're ready to help.

RECENT POSTS

April 7, 2026
Project Overview Compass Electrical Solutions recently installed two High Volume Low Speed (HVLS) fans in the MICDS High School natatorium, delivering improved air circulation, enhanced comfort, and greater energy efficiency for the school’s aquatic facility. Project Scope & Highlights HVLS Fan Installation – Installed two large-diameter fans designed to move air efficiently across wide, open spaces. Energy Savings – Improved ventilation and cooling while reducing HVAC load and energy consumption. Optimized Indoor Comfort – Enhanced temperature control for athletes, staff, and spectators within the natatorium environment.
March 18, 2026
Project Overview Compass Electrical Solutions partnered with the White Bluff Apartments to address an urgent electrical issue triggered by insurance requirements. The complex’s aging electrical panels were deemed a fire hazard , prompting a full-scale replacement of panels and meter banks across the 39-unit property. Despite the scope and urgency, Compass delivered the entire project in under one week, with careful coordination to minimize disruption to tenants and maintain safety throughout. Project Scope & Highlights Furnished and installed a natural gas-powered Blue Star generator to supply full-building backup power Demolished 40 Unsafe 100-Amp Panels – Disconnected and safely removed all existing panels. Removed 39 Existing Meter Sockets – Properly decommissioned aging equipment. Installed New Meter Banks One (1) 26-gang meter bank with 600-amp main service disconnect One (1) 13-gang meter bank with 400-amp main service disconnect (with a 25-week lead time) Installed New Circuit Breakers – Matched to existing tenant circuit requirements. Reconnected Existing Circuits – Ensured continuity of service. Coordinated Power Cutover – Worked closely with the landlord and tenants to plan power shutoffs and minimize downtime.
March 13, 2026
Commercial electrical maintenance helps businesses save money by preventing failures, reducing downtime, and extending the life of electrical systems.
Show More