MICDS Squash Courts: AV Integration & Power Installation

October 15, 2025

Project Overview

Compass Electrical Solutions partnered with Mary Institute and Saint Louis Country Day School (MICDS) to support a technology and power upgrade at their squash courts facility. The project involved TV installation, power and data infrastructure, and AV integration to support real-time scoring and enhanced user experience.


Project Scope & Highlights



  • Power Installation – Cut power into the wall above the squash courts to support mounted displays.
  • TV Installation – Mounted and installed six new TVs, each fitted with protective covers to withstand the court environment.
  • AV Cabling & Terminations – Installed HDMI and data cabling, enabling communication between the TVs and iPads used for scoring.
  • Labeling & Testing – Clearly labeled each display (including those in the courts and lobby) and tested all connections to ensure functionality.
Squash court interior: white walls, wooden floor, red lines, scoreboard, overhead lighting.

Tech-Enhanced Athletics

With these upgrades, MICDS now offers a seamless, integrated scoring system that enhances both player and spectator experiences. The installation supports durability, ease of use, and real-time data display, all within a highly active athletic environment.

Smart AV + Power Solutions for Schools & Sports Facilities

Compass Electrical Solutions brings together precision installation and smart tech integration for schools, gyms, and recreational spaces. From cabling to final testing, we ensure every connection counts.


Planning an AV or tech upgrade? We're ready to help.

RECENT POSTS

August 12, 2026
Project Overview Compass Electrical Solutions proudly partnered with CK Power on the installation of a 600kW Blue Star Emergency Generator, delivering reliable backup power while modernizing the facility's electrical infrastructure. In addition to the generator installation, our team consolidated the building's electrical service, creating a more efficient and streamlined power distribution system. Project Scope & Highlights 600kW Blue Star Diesel Generator Installation – Installed a commercial-grade emergency generator to provide dependable backup power for the facility. New 1,000-Amp, 277/480V Three-Phase Service – Upgraded the building's electrical service to support increased capacity and improved efficiency. Extensive Conduit Installation – Installed hundreds of feet of 3-inch and 4-inch conduit, including complex custom bends to navigate the existing facility. New 240V/200A Panel – Added dedicated power distribution for facility operations. 300 kVA Transformer Installation – Installed a new transformer to support the upgraded electrical system. 800-Amp Disconnect Switch – Added new disconnect equipment to improve safety and serviceability. Weekend Power Cutover – Carefully coordinated a facility shutdown over the weekend to transfer power and commission the new generator with minimal operational disruption. Reliable Power. Smarter Infrastructure. This project demonstrates Compass Electrical Solutions' ability to manage complex electrical upgrades while keeping business operations at the forefront. By combining emergency backup power with a more efficient electrical distribution system, CK Power now benefits from increased reliability, improved energy performance, and long-term operational flexibility.
July 21, 2026
Project Overview Compass Electrical Solutions recently completed a specialized electrical installation for Seiler Plastics , supporting the addition of new extruder and grinder equipment within an active manufacturing facility. This project required careful coordination to minimize disruption while expanding the plant’s production capabilities. Project Scope & Highlights Medium & Low Voltage Installation – Delivered comprehensive electrical infrastructure to support new manufacturing equipment. Power Distribution for Extruder Systems – Installed dedicated power solutions for the new extruder and associated equipment. Bus Duct Modifications – Updated existing bus duct systems to accommodate expanded operational demands. New Disconnect Installations – Added disconnects for improved safety, serviceability, and code compliance. Process Cooling Support – Provided electrical integration for process cooling systems critical to manufacturing performance. Supporting Industrial Growth with Precision Working within an active production environment, Compass Electrical Solutions ensured the project was completed safely, efficiently, and with minimal interruption to ongoing operations. The result is a scalable electrical system built to support Seiler Plastics’ continued growth and production demands.
Signs You Need an Electrical Panel Upgrade
July 14, 2026
Understand the electrical panel upgrade process, common warning signs, and why proper capacity matters for today’s household power needs.
Show More