Project Overview

Compass Electrical Solutions proudly partnered with John Burroughs High School on a ground-up construction project featuring a new locker room, athletic pavilion, and scoreboard. This multifaceted installation showcased the full breadth of our commercial electrical capabilities, from infrastructure to specialized systems.


Project Scope & Highlights



  • New Transformer Installation – Provided dedicated power infrastructure for the new facilities.
  • Directional Boring & Long Electrical Runs – Executed complex underground runs to connect remote areas to established power sources.
  • Custom Lighting & Industrial Fans – Installed tailored lighting solutions and high-capacity fans for athletic comfort and visibility.
  • Low Voltage Systems – Integrated structured cabling and low-voltage wiring to support AV, communications, and controls.
  • Scoreboard Power – Supplied and connected reliable electrical service to the new athletic scoreboard
Baseball field with blue and gold "BURROUGHS BASEBALL" sign. Covered structure in the background. Cloudy sky.

Powering School Spirit & Athletic Excellence

With enhanced facilities and upgraded infrastructure, John Burroughs now benefits from efficient, dependable systems designed to support both athletes and spectators. This project reflects Compass Electrical Solutions’ commitment to delivering turnkey electrical solutions that meet performance, safety, and longevity goals.

Comprehensive Electrical for Campus Expansion

From classrooms to athletic complexes, Compass Electrical Solutions delivers high-quality electrical installations for educational institutions throughout the St. Louis region.


Have a campus project on the horizon? Let's talk.

RECENT POSTS

June 24, 2026
Project Overview Compass Electrical Solutions recently completed a courtyard lighting retrofit at the University of Missouri–St. Louis (UMSL), enhancing visibility, safety, and energy efficiency in the campus’s popular Millennium Courtyard area. Project Scope & Highlights Removed Existing Light Heads – Safely demoed and removed outdated fixtures from existing poles. Installed New LED Fixtures – Furnished and installed 11 new 21,000-lumen LED pole light heads with slip fitters. Control Integration – Verified full functionality and ensured integration with existing timer switch controls. Safe Access & Clean-Up – Used a scissor lift for safe installation and left the work area clean and disruption-free.
infrared electrical maintenance
June 15, 2026
See how infrared electrical maintenance helps find hidden hot spots, prevent electrical failures, and improve reliability through early problem detection.
June 8, 2026
Project Overview Compass Electrical Solutions recently completed a critical electrical infrastructure upgrade at River Chase Apartments , replacing an outdated six-meter setup with a modern, code-compliant meter bank designed to improve safety and reliability for residents. Project Scope & Highlights  Existing Meter Removal – Safely disconnected and removed the property’s original six-meter electrical setup. New Six-Meter Panel Installation – Furnished and installed a new 120/240-volt six-meter panel in the existing location. 60-Amp Main Breakers – Each apartment unit received a dedicated 60-amp main breaker serving as its individual shutoff. Main Power Reconnection – Reconnected the primary electrical feed from the Ameren transformer to restore service. Apartment Circuit Reconnection – Reconnected all wiring supplying power to each apartment panel. Grounding & Safety Upgrades – Installed a new ground rod to ensure the system meets current grounding and electrical safety standards.